Then, on Day 41, we started seeing the foundation being laid for our slab to be poured.
After those 40 days of laying sand, digging trenches, laying pipe, and post tensioning rods, we finally came to this:
The very next day, on Day 81, our slab was poured!
And the next 40 days have looked like this:
This is how it looks today, Day 130: