When my house was being built, I was told more than once that warranty people would be in touch with me about 9 days after closing, and then again a little further out and then around one year and again at 18-months. So far, I haven't heard anything from anyone unless I open my mouth and ask. Thankfully, Raymond, my construction superintendent has been wonderful in that respect. He's truly been a Godsend from day one (er, Day 41, when he came on).
There are still a couple of things needing attention in my house that didn't get completed 100% and that I need to have done before I feel confident that anything else is on my shoulders to take care of. One, the ceiling where my outdoor ceiling fan was installed is still a jagged, gaping hole. It needs to be caulked, painted and make to look finished. Second, beneath the edges of my countertops is simply some random caulking. It needs to be completed so Im happy with how it looks if I happen to be sitting on the floor and look up at it.
I went ahead and inquired on KB's website under "contact" and "warranty service". Im sure someone will get back with me in a timely fashion. They've been stellar in that respect all throughout my experience.
Showing posts with label repair. Show all posts
Showing posts with label repair. Show all posts
Tuesday, April 22, 2014
Tuesday, January 21, 2014
Day 88: Fixing the Problem
Raymond sent over a picture this morning showing the problem area was demolished today. Good riddance! Im happy and relieved to see that they are taking care of this. I am thankful to KB, Chance and Raymond for offering such great customer service in getting this handled.
In other related news, I heard from Jaime today about locking in an interest rate. Ive locked in and have a closing date tentatively set for March 26th!
The plumber installed the tubs and shower yesterday however I was pretty unhappy at the time and didn't bother snapping a pic so I did today. And, we got shingles delivered today!
In other related news, I heard from Jaime today about locking in an interest rate. Ive locked in and have a closing date tentatively set for March 26th!
The plumber installed the tubs and shower yesterday however I was pretty unhappy at the time and didn't bother snapping a pic so I did today. And, we got shingles delivered today!
Subscribe to:
Posts (Atom)