Showing posts with label installation. Show all posts
Showing posts with label installation. Show all posts

Tuesday, April 1, 2014

Day 158: Three Days Til Closing!

Ran by the house this morning and saw the backsplash. It's not all done as it still needs to be installed over the nook and the whole thing needs grouting. As it is right now though, it looks amazing! Its so hard to pick from samples, in hopes that it'll all look good once it's said and done. Im relieved the house is coming along as nicely as I had hoped.

I also ran into Raymond as I was leaving and he mentioned the house was being inspected today, and that Mr. Horton, his boss, would be swinging by. Im glad they are staying on top of things for me. With closing only 3 days away, Im starting to get a bit nervous. Biggest purchase of my life! I couldn't be more happy or ready.

(See Part II below)










Tonight we stopped by and found the house had been cleaned. And the backsplash was finished! It looks so beautiful! Im loving seeing my whole kitchen complete.


 
 
 
 
 
 
 
 
 

Wednesday, March 26, 2014

Day 152: Nine Days Til Closing!

Today the countertops were installed. I chose the Eco by Cosentino tops in Polar Cap. They look wonderful! The plastic wrap was still on them until the backsplash gets installed tomorrow. I peeled back a corner tho so I could see them. Pretty! The white looks super clean and gives a nice bright contrast into the room. I'm thrilled with them!
 
Nine days til closing!
 
 












Wednesday, March 12, 2014

Day 138: Oh Wow! Oh Wow! Oh Wow!

"Oh wow! Oh wow! Oh wow!" That was the reoccurring theme of what the girls and I kept saying as we checked out the new house this evening.

Landscaping has begun! We were getting the grass installed and they already have a small flowerbed out front along with two holes for where the trees will placed [tomorrow]. It looks good!






 
 
Thankfully my grass is somewhat green and they even had the sprinklers running in the backyard. Now I just have to make sure it keeps getting watered until I move in.
 
 
 
 








Moving on, oh wow! We saw FLOORING!!! Carpet! Wood! Oh wow!



This is a great color! It's called "Thistle" by Shaw and is an Anso Nylon shag-like multi-tone carpet. Beneath is a memory foam carpet pad.



I love these wood floors! They have wonderful coloring in them that really complements the cabinetry. I couldn't be more pleased with my choice, considering it was made in about 10 minutes at the design studio. It's still being installed, so we couldn't walk on it and it was dirty from the sawdust and footprints, but it still looks amazing! Love it!







This one isn't a great picture, but you get the idea of what it will look like as you look across the room -- the wall color, the trim, the cabinets, the FLOOR!



Thursday, March 6, 2014

Day 132: Fence Posts, Shower Surround & Mom

Today I brought my mom out to see the house. She was amazed at all that had been done since her last visit. While we were there, a worker was testing out the lights and smoke detectors. It was the first time Ive seen the house go "live". That's been a long awaited day. Sharing it with my mom made it a fun moment. 

We got to see lots of other little things: outlet covers and switch plates have been put on, the A/C was installed outside, our water heater was put in, and the fence posts were set. Talk about a day!

Mom loved it. We walked thru and she looked at everything, commenting on the colors and we chatted about the future. She agreed that she thought the granite was completely off from what we had seen (and I ultimately picked) at the KB Home Design studio. I was glad to hear her opinion.  

I'm looking forward to hearing what corporate office says about it. Maybe I'll get some good news tomorrow for my birthday.
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Wednesday, March 5, 2014

Granite Saga

Part of the reason I decided to build a home was so that I could have a say in all of the finishing touches. Where does a family spend most of their time? In the kitchen! So, with that in mind, I opted for the lower, extended flush countertop so that we could have ample space to do crafts and science experiments and baking and all of the kinds of things that we do as a family, in that kitchen.

Im building a home that I had hoped to create a place where my children and I could create wonderful new memories. We've been through a lot and the new space is a fresh start.  I had those thoughts in my head when I made my selections at the KB Home Studio. Afterall, this is Built-to-Order, not Built-to-Sell. I should get everything I ordered without question.

 
It's my sentiment that I should be gaga, head over heels, super pleased with all it. And if one supplier can't deliver, why aren't they using another? Why isn't Summit Stoneworks updating their samples? And why did they have me pick my choices 4 months before they even ordered it?? Maybe buyers need to be able to select their slabs instead of relying on a sample from who knows when. I do recall that Jennifer, my designer, had told me certain ones weren't available, and 1 or 2 had been marked as such, but the ones I was choosing from were available. They only thing I was told was that there could be variations in the veining of the stone. I understand that. But an entirely different product is not in that description.

Here is the image Summit Stoneworks shows as 'Delicatus' on their website:


 
 
That sure looks similar to the sample I saw at the studio. This is not what they installed in my home.
 
And this is a image of what Arctic Cream looks like, taken from another granite supplier's website:
 
 

See the creamy, beige background and the black veins? That is what I was given.


Here is a closeup of the granite that was installed in my home:



Compare this granite to my walls, which are not white but are actually Sherwin Williams' "Softer Tan". This granite is so dark it makes my walls look white!



This will not go with my white backsplash, that's for sure! There isn't any white in this stone at all!


Now this is Delicatus:












 

Monday, March 3, 2014

Day 129: Patio Railing

Today we discovered that our back patio railing had been installed. It sure accents how large of a patio we have! The only bad thing was that they installed it wrong, damaging the siding. Grr!



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Sunday, March 2, 2014

Day 128: Granite

So it appears I'm unsettled with the granite. At first when I saw it, I was surprised because it was not how I had envisioned or designed. I had my heart set on the sample that I had picked out and ordered at the design studio, and the colors it entailed. I picked out other things based on my kitchen centerpiece--the granite. I chose espresso cabinets to match the chocolate sparkles that Delicatus is known for. I liked the contrast between dark cabinets and white countertops. I chose a sleek, pure white back splash to go with it as well. 
And after lamenting, pouring over pictures, going to see it in person more than once this past weekend, and doing a lot of research, I know this is *not* Delicatus.  

I am convinced this granite is Arctic Cream. I can find plenty of pictures of that and it all looks like what I have installed. It features a beige-ish, latte-colored background with dramatic, striking black lines. It's not white at all.


I have found no other pictures anywhere--not on granite websites, not on blogs, not on home building websites, not on pinterest or Houzz, not even on Summit Stoneworks' website (the granite company who installed this) -- not once have I found a picture of Delicatus that looks like this.
Im definitely going to have to talk to Raymond and Jennifer about this.




 
 
 
 
 

Friday, February 28, 2014

Day 126: Brickwork is Almost Done!

The house is almost done getting her brickwork. This is sure a messy process! Isn't she looking grand?
 
 
 
 
 
 
 
 
 
 
 

Thursday, February 27, 2014

Day 125: Granite

Today granite was installed. I was sort of surprised by it because the look of it was different than I imagined. Turns out it's not *my* granite. This, I am almost certain of, is called Arctic Cream. I ordered Delicatus.
 
Now I have to decide whether to love it or have it removed.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Wednesday, February 26, 2014

Day 124: Tile Complete

It's a cold day today which means the workmen couldn't finish laying brick. The tile inside is complete and looks sharp!
 
 
 
 
 
 
 
 

Friday, February 7, 2014

Day 105: Beginning of the Drywall

Raymond called this morning and invited me out to the house to determine placement of the back porch stairs. After showing him where I want them, he showed me where the broken truss was repaired.
 
Yesterday was the house's exterior wall insulation inspection along with the Greenzone inspection. Both passed. Yay!
 
While we were there, workmen were there installing drywall on the ceiling in the kitchen. It was pretty cool to watch. One guy was on stilts! He needed to be tall to reach the ceiling so he could screw the nails in.
 
He had a neat drill, too, that only turned the screw after he applied pressure to it on the drywall. Then it only screwed a set amount of distance so that the screws never over-screwed. This keeps all of the surface flat, no dimpling.
 
After he screwed the drywall up, he had another tool that he used. It was some sort of saw that he could poke into the space where the light casing was preinstalled. The metal edge of the casing guided the saw and it cut a perfect circle in nothing flat. It was very cool to watch.